2021 China New Design Experienced Company Truck Pump - Power Packer Switch Cab Tilt System – Power-Packer
2021 China New Design Experienced Company Truck Pump - Power Packer Switch Cab Tilt System – Power-Packer Detail:
Quick View
Sub Parts | |||
Customer | Power-Packer No. | Customer No. | Truck type |
CNHTC | CC140903-900 | WG9925820032 | HOWO |
CC141021-900 | WG9719820032 | HOWO | |
C170840-900 | WG9X25820030 | HOWO | |
C130210-900 | 811W41723-6030 | SITRAK | |
C130218-900 | 811W41723-6032 | SITRAK | |
C130209-900 | 811W41723-6031 | SITRAK | |
CC180726-900 | CC180726-900 | SITRAK | |
C170834-900 | WG9525820143 | HAOHAN | |
CC110615-900 | WG9525820064 | HAOHAN | |
C151214-900 | AZ9525820064 | HAOHAN | |
TATA | C111119-900 | C111119-900 | Prima |
C111118-900 | C111118-900 | Prima | |
C111117-900 | C111117-900 | Prima | |
C111121-900 | C111121-900 | Prima | |
C111120-900 | C111120-900 | Prima |
Download
Parameters
Product | Customer No. | Customer | Size(mm) | Weight | Other feature |
sub parts coupler | WG9925820032 | CNHTC | 420mm | 0.118+/-10%kg | match CPE2-083012 |
Technology / Innovations – E-Pump Switch
Advantages of pull switch
1) The operator could stand 4 meters away from the front of the truck, much safer, which avoid accidental injury to the operator during the cab tilt.
2) Humanized operation will not feel fingers tired after long-hour working.
3) Better protection, a little water will not affect the switch performance.
4) Better visualization, light up when the switch is turned on, thus operator know the reversing system is running.
Sales
Power-Packer’s headquarters are in Oldenzaal, The Netherlands where the Product Strategy is located, which includes the Global Sales, Engineering and Marketing departments in addition to that Operations and Logistics.
Working for world markets means being able to operate efficiently as a business partner worldwide – that’s why we have a global footprint of manufacturing facilities across Europe, Asia, North and South America.
Engineering
Power-Packer’s products are custom specific solutions. Therefore, it is very important that the design of each product suits the customer, and has doubtless performance. The main objective of our engineers and production engineers is to design products and production processes in accordance with our customers specifications and our own high standards. Our engineering department consists of specialists who design and innovate hydraulic and electro-hydraulic actuation systems according to customer requirements. The design process is carefully planned and well structured, using common design tools like:
– Function Analysis
– Failure Mode and Effect Analysis
– Design for Assembly
Electronic CAD Data interchange, as well as the possibility of resident engineering, enable intensive and fast communication with our customers. Products are designed in concurrence with their specific production process, which means an optimization of production flow, manufacturing effort and stock usage. At the end, Power-Packer’s products will be well functioning components for reliable end products that are offered by our customers.
Product detail pictures:
Related Product Guide:
Our mission is usually to turn into an innovative provider of high-tech digital and communication devices by furnishing benefit added design and style, world-class manufacturing, and service capabilities for 2021 China New Design Experienced Company Truck Pump - Power Packer Switch Cab Tilt System – Power-Packer , The product will supply to all over the world, such as: French, Hyderabad, Bulgaria, In the increasingly competitive market, With sincere service high quality products and well-deserved reputation, we always offer customers support on products and techniques to achieve long-term cooperation. Living by quality, development by credit is our eternal pursuit, We firmly believe that after your visit we will become long-term partners.
By Edwina from Cancun - 2018.12.11 11:26
Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
By Griselda from El Salvador - 2018.09.29 13:24